When the Kiewit/Weeks/Sandwell JV needed to install high capacity rock socketed piles for the construction of Canaport LNG’s state-of-the-art liquefied natural gas terminal in Saint John, New Brunswick, they counted on Bermingham’s extensive experience as both a marine foundation contractor and equipment manufacturer.

Permanent jackets were utilized to position 36-inch pipe piles which were vibrated through the overburden and impacted into the rock before being rock-socketed using reverse-circulation drilling.

For this project, Bermingham supplied a custom flying lead outfitted with a Berminghammer reverse-circulation drill along with a 75-ton crowd system which could be utilized in a freestanding configuration. Despite the custom design this equipment, Bermingham detailed, manufactured and delivered all the required equipment in only 10 weeks.

Download a PDF of this Project Report

3D Installation Model 3D Installation Model